Kundenlogin 0 Einkaufswagen
Home Bücher eBücher Zeitschriften Referenzen und Berichte Autoren, Herausgeber, Rezensenten A – Z Produktindex
Flexible Automation and Intelligent Manufacturing, 1997:
Proceedings of the Seventh International FAIM Conference

ISBN Druckformat: 978-1-56700-089-4

ISBN Online: 978-1-56700-442-7

FRONTIER BASED SCHEDULING IN FMS

Abstrakt

In this paper the problem of scheduling to meet two performance criteria is considered. The first criteria relates to timeliness while the second relates to precedence (or technological) constraints. An ideal schedule is one that yeilds the best measure of timeliness without violating the precedence constraints. However in some systems, such as flexible manufacturing systems and real time scheduling systems, it is sometimes possible that all precedence constraints need not be met. Given deadlines by which all tasks must be completed, it may be desirable to perform an alternate set of tasks, perform tasks out of order or even omit some tasks given these deadlines. In this paper the case where it is permissible to violate some precedence constraints for a commensurate improvement in meeting timing constraints is considered. Thus, the precedence constraints are no longer inviolate constraints, but can be represented by another measure of performance. The problem of preparing task schedules is formulated such that a trade-off between timing and precedence constraints is made when both constraints cannot be met and procedures are developed to obtain solutions for arbitrary deadlines.
Home Begell Digitales Portal Begell Digitale Bibliothek Zeitschriften Bücher eBücher Referenzen und Berichte Autoren, Herausgeber, Rezensenten A – Z Produktindex Preise und Aborichtlinien Über Begell House Kontakt Language English 中文 Русский 日本語 Português Deutsch Français Español