カスタマーログイン 0 ショッピングカート
ホーム 書籍 電子書籍 ジャーナル 参考文献と会報 著者、編集者、レビュー者 A-Z商品インデックス
Proceedings of Symposium on Energy Engineering in the 21st Century (SEE2000) Volume I-IV

ISBN 印刷: 1-56700-132-7

EVALUATION OF TOPPING CYCLE PERFORMANCE IN IGCC SYSTEMS

要約

Integrated Gasification Combined Cycle (IGCC) power system has attractive prospective well into the next century with its high efficiency and excellent environmental superiority. At present, many demonstration power plants have been built in the world. Research in this area is also actively carried on in China and a 400MW-demonstration power plant will be built in the next five years. The IGCC system commonly has two parts: the topping cycle and the bottom cycle (HRSG and Steam Turbines). The topping cycle consists of the gasifier, the syngas cooling and clean-up subsystem, the air separation unit (ASU) and the gas turbine. The gas turbine is the key component of the topping cycle as well as the total IGCC system. The purpose of this paper is to study the influence on IGCC topping cycle performance of different degree of ASU integration incorporated with gas turbine and proportion of the re-injecting netrogen. In this paper, the key factors, which affect the topping cycle, are analyzed, a new idea−simultaneous optimization of the two opening variables−is presented and a mathematical model and the corresponding computing procedure are developed to realize the simultaneous optimization. This procedure is employed to calculate a typical commercial IGCC topping-cycle system, which is based on a slurry-feed gasifier, a low-temperature clean-up subsystem, a low-pressure ASU and a large gas turbine. The acquired results constitute useful information on the analysis and optimization of IGCC topping cycle performance during the system design phase.
ホーム Begell Digital Portal Begellデジタルライブラリー ジャーナル 書籍 電子書籍 参考文献と会報 著者、編集者、レビュー者 A-Z商品インデックス 価格及び購読のポリシー Begell Houseの概要 連絡先 Language English 中文 Русский 日本語 Português Deutsch Français Español